Conceptual Design of Hybrid Cable-Stayed Bridge with Central Span of 1000 m Using UHPC
Auteur(s): |
Hyejin Yoon
Won Jong Chin Hee Seok Kim Moon Seoung Keum Young Jin Kim |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Engineering, 2013, n. 9, v. 5 |
Page(s): | 744-750 |
DOI: | 10.4236/eng.2013.59089 |
- Informations
sur cette fiche - Reference-ID
10534083 - Publié(e) le:
23.12.2020 - Modifié(e) le:
26.02.2021