Comprehensive ahead prospecting for hard rock TBM tunneling in complex limestone geology: A case study in Jilin, China
Auteur(s): |
Bin Liu
Qian Guo Zhengyu Liu Chuanwu Wang Lichao Nie Xinji Xu Lei Chen |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Tunnelling and Underground Space Technology, novembre 2019, v. 93 |
Page(s): | 103045 |
DOI: | 10.1016/j.tust.2019.103045 |
- Informations
sur cette fiche - Reference-ID
10365025 - Publié(e) le:
21.08.2019 - Modifié(e) le:
06.10.2019