Purpose

The standard forms of construction contract are receiving greater attention in the management of projects scholarship as they probably influence the project success and project disputes. The extant literature suggests that the standard forms of construction contract are one of the top sources of disputes. The purpose of this paper is to examine the effectiveness of the standard forms of construction contract, FIDIC and NEC, in reducing disputes in the Palestinian construction industry.

Design/methodology/approach

The researchers have used qualitative methods to collect data and more specifically have undertaken 12 semi-structured interviews.

Findings

The study reveals that the standard forms of construction contract can be a tool to minimise disputes, but certainly not to eradicate them, and NEC appears to be more capable than FIDIC to do so.

Originality/value

This study contributes to knowledge by bringing an industrial perspective into the role of standard forms of contract in disputes creation and avoidance. The interviewees, recurrent users of FIDIC contract, criticised certain features and expressions and proposed some solutions.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1108/ecam-10-2016-0235.
  • Informations
    sur cette fiche
  • Reference-ID
    10576625
  • Publié(e) le:
    26.02.2021
  • Modifié(e) le:
    26.02.2021
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine