Comparison Analysis for Implementation Time of Column Formwork Using Three Formwork Methods in a Building Project at Bandung Province

Auteur(s):



Médium: article de revue
Langue(s): anglais
Publié dans: IOP Conference Series: Earth and Environmental Science, , n. 1, v. 1324
Page(s): 012032
DOI: 10.1088/1755-1315/1324/1/012032
Abstrait:

The construction world, especially in modern times, technological innovations are developing rapidly. One of these innovations is formwork. The real proof of its development is the formwork method, which has an increasing number of types. This study describes the time comparison between the three formwork methods consisting of conventional, semi-system, and full system formwork for column work on the UPI Bandung multi-storey building project. The research method that has been done is quantitative. The analysis is carried out by calculating the volume of work, identifying the coefficient of workers from journals and articles, calculating labour productivity and then the duration of work for each formwork method can be calculated. The results obtained from this study regards the duration of work on each formwork method column in each building studied. In conclusion, the duration of column work with the conventional formwork method has the longest duration of work, followed by the semi system method and the full system method.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1088/1755-1315/1324/1/012032.
  • Informations
    sur cette fiche
  • Reference-ID
    10780175
  • Publié(e) le:
    12.05.2024
  • Modifié(e) le:
    12.05.2024
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine