Comparative analysis of CPM, PDM and PERT method on the duration of bridge work (Case study : Gelam Bridge Project)

Auteur(s):

Médium: article de revue
Langue(s): anglais
Publié dans: IOP Conference Series: Earth and Environmental Science, , n. 1, v. 1169
Page(s): 012011
DOI: 10.1088/1755-1315/1169/1/012011
Abstrait:

The preparation of the duration is a very important thing considering that there are many project work activities and must also be arranged in such a way that sequentially starting with the work activity starting until the completion of the bridge project work activity. The use of the three methods in the preparation of project activity activities is the critical path method (CPM), precedence diagram method (PDM), and project evaluation review technique (PERT). The results of the study showed that in preparing the duration of bridge work using these three methods obtained in the CPM method, results were obtained on the duration of the Gelam Bridge project work for 178 days, then using the PDM method, results were obtained on the duration of the Gelam Bridge project work for 141 days, and while the PERT method took a duration of 184.1 days, where the duration was quite long compared to the two methods above, due to the aspects of probability. The calculation of the duration will always be different because it depends on the volume of the work to be done to the coefficients in the work with the method used.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1088/1755-1315/1169/1/012011.
  • Informations
    sur cette fiche
  • Reference-ID
    10780399
  • Publié(e) le:
    12.05.2024
  • Modifié(e) le:
    12.05.2024
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine