Change Orders and Schedule Performance of Design-Build Infrastructure Projects: Comparison between Highway and Water and Wastewater Projects
Auteur(s): |
Medya Fathi
Pramen P. Shrestha Binita Shakya (Formerly, Graduate Student, Dept. of Civil and Environmental Engineering and Construction, Howard R. Hughes College of Engineering, Univ. of Nevada, Las Vegas, NV 89154.) |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, février 2020, n. 1, v. 12 |
Page(s): | 04519043 |
DOI: | 10.1061/(asce)la.1943-4170.0000353 |
- Informations
sur cette fiche - Reference-ID
10579994 - Publié(e) le:
08.03.2021 - Modifié(e) le:
08.03.2021