Challenges Hindering the Resourcing for Post-Disaster Housing Reconstruction in Gaza

Auteur(s):


Médium: article de revue
Langue(s): anglais
Publié dans: Journal of Construction in Developing Countries, , n. 2, v. 26
Page(s): 183-210
DOI: 10.21315/jcdc2021.26.2.9
Abstrait:

Resourcing post-disaster housing reconstruction (PDHR) entails many drawbacks creating bottlenecks to reconstruction projects. Understanding these vulnerable issues is of utmost to identify the appropriate interventions to mitigate their effects. The devastating aggression in 2014 in Gaza Strip served as a typical example of resources hampers. Based on the quantitative approach, the research employed a self-administrated questionnaire survey to identify the most significant challenges hindering the resourcing for post-2014 aggression housing reconstruction. The questionnaire targeted 55 of the key people in the implementing agencies of post-2014 aggression housing reconstruction. The data collected was analysed using descriptive statistics, through frequency distribution and effect index (EI); and using inferential statistics through one sample Wilcoxon signed rank test. Findings indicated that the challenges related to political issues have the most significant effect on resourcing the PDHR. The main key challenges are: (1) Difficulties to obtain permits from the Israeli side to flow the reconstruction materials into the Gaza Strip, (2) Insufficient funds for reconstruction efforts and (3) Refusal of the international community to contact the local de facto government. This research fills the knowledge gap relating to Gaza and provides the basis for more research on resourcing problems. This research has also extended, updated and confirmed the current knowledge regarding challenges hindering the resourcing for PDHR. The results draw attention of the implementing agencies in Gaza to the factors that creating bottlenecks to resource the reconstruction projects in order to overcome them and to mitigate their negative effects.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.21315/jcdc2021.26.2.9.
  • Informations
    sur cette fiche
  • Reference-ID
    10647107
  • Publié(e) le:
    10.01.2022
  • Modifié(e) le:
    10.01.2022
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine