Causes of Rework in Construction Projects in Ukraine
Auteur(s): |
R. Trach
K. Pawluk M. Lendo-Siwicka |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Archives of Civil Engineering, septembre 2019, n. 3, v. 65 |
Page(s): | 61-74 |
DOI: | 10.2478/ace-2019-0034 |
Abstrait: |
The collapse of the Soviet Union was the cause of a significant decline in many economies of the newly created countries. However, many of them, including the Ukrainian economy, are slowly recovering. One of the largest branches of the economy in this country is construction, which, despite political turmoil, is constantly growing, especially in the private real estate development sector. Despite the fact that the construction market is constantly developing, it is limited by the costs of rework and alterations resulting from many reasons. The key negative effects of modifications to the results of the project are exceeding the budget and time of project implementation, dissatisfaction with the project team, violation of contractual requirements and lowering the quality of the final product. Therefore, the purpose of this article was to determine the reasons for the emergence of rework in the in Ukraine by analyzing the results of surveys conducted among construction enterprises. |
Lieux géographiques
- Informations
sur cette fiche - Reference-ID
10378736 - Publié(e) le:
10.11.2019 - Modifié(e) le:
10.11.2019