Causes of cost overruns in building construction projects in Asian countries; Iran as a case study
Auteur(s): |
Shima Amini
Alireza Rezvani Mohsen Tabassi Seyed Saeed Malek Sadati |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Engineering, Construction and Architectural Management, mai 2022, n. 7, v. 30 |
Page(s): | 2739-2766 |
DOI: | 10.1108/ecam-05-2021-0445 |
- Informations
sur cette fiche - Reference-ID
10665190 - Publié(e) le:
09.05.2022 - Modifié(e) le:
02.09.2023