California HSR Corridor Evaluation and Environmental Constraints Analysis
Auteur(s): |
Paul Taylor
(Vice Pres., Parsons Brinckerhoff Quade & Douglas, Inc., 505 South Main St., Orange, CA 92668.)
Daniel S. Leavitt (Executive Dir., California Intercity High Speed Rail Commission, P.O. Box 942874, Sacramento, CA 94274-0001.) Kip D. Field (Sr. Transp. Engr., Parsons Brinckerhoff Quade & Douglas, Inc., 505 South Main St., Orange, CA.) |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Transportation Engineering, janvier 1997, n. 1, v. 123 |
Page(s): | 1-11 |
DOI: | 10.1061/(asce)0733-947x(1997)123:1(1) |
- Informations
sur cette fiche - Reference-ID
10633891 - Publié(e) le:
29.11.2021 - Modifié(e) le:
29.11.2021