Business Practice Note No. 5: Post-contract management
Auteur(s): |
Colin Toms
|
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | The Structural Engineer, mai 2017, n. 5, v. 95 |
Page(s): | 26-27 |
DOI: | 10.56330/tltt8929 |
Abstrait: |
Colin Toms provides advice on matters that an engineer should plan for once construction begins on site. |
- Informations
sur cette fiche - Reference-ID
10763027 - Publié(e) le:
23.03.2024 - Modifié(e) le:
23.03.2024