Buffer Sizing Model Incorporating Fuzzy Risk Assessment: Case Study on Concrete Gravity Dam and Hydroelectric Power Plant Projects
Auteur(s): |
Semsettin Balta
M. Talat Birgonul Irem Dikmen |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering, mars 2018, n. 1, v. 4 |
Page(s): | 04017039 |
DOI: | 10.1061/ajrua6.0000948 |