Briefing: The Thames Barrier: an accidental asset in London’s attempts to address climate change
Auteur(s): |
Simon Harris
(Construction and Civil Engineering Team, Randstad, UK)
James Staunton (Independent consultant, Farnham, UK) |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Proceedings of the Institution of Civil Engineers - Civil Engineering, août 2024, n. 3, v. 177 |
Page(s): | 1-2 |
DOI: | 10.1680/jcien.24.00250 |
- Informations
sur cette fiche - Reference-ID
10784816 - Publié(e) le:
20.06.2024 - Modifié(e) le:
31.08.2024