Bridging the Gap: Assessing Performance and Planned Importance in Watershed Projects Using Participatory Methods
Auteur(s): |
Bhabesh Mahanta
Arup Kumar Sarma Sashindra Kumar Kakoty |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of The Institution of Engineers (India): Series A, 30 septembre 2024, n. 4, v. 105 |
Page(s): | 835-850 |
DOI: | 10.1007/s40030-024-00827-z |
- Informations
sur cette fiche - Reference-ID
10792180 - Publié(e) le:
01.09.2024 - Modifié(e) le:
10.11.2024