0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Auteur(s):
Médium: article de revue
Langue(s): anglais
Publié dans: Structural Engineering International, , n. 1, v. 6
Page(s): 32-36
DOI: 10.2749/101686696780496067
Abstrait:

Besides the concrete deck slab, continuous steel composite bridges with double composite action have a concrete bottom chord at the haunches over the main piers. This concrete bottom chord increases stiffness and reduces construction costs. The advantages of this system are illustrated by three bridges with main spans up to more than 200 m. In addition, prestressing versus reinforcing of the roadway slab at the piers is discussed.

  • Informations
    sur cette fiche
  • Reference-ID
    10003372
  • Publié(e) le:
    16.09.2002
  • Modifié(e) le:
    28.10.2016
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine