A BIM-based two-stage fuzzy inference system for safety risk prediction in building construction projects
Auteur(s): |
Mohammadsaeid Parsamehr
(Department of Civil and Environmental Engineering, University of Windsor, 401 Sunset Ave, Windsor, ON, N9B 3P4, Canada)
Rajeev Ruparathna (Department of Civil and Environmental Engineering, University of Windsor, 401 Sunset Ave, Windsor, ON, N9B 3P4, Canada) |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Canadian Journal of Civil Engineering / Revue canadienne de génie civil, janvier 2023, n. 1, v. 50 |
Page(s): | 11-23 |
DOI: | 10.1139/cjce-2022-0072 |
- Informations
sur cette fiche - Reference-ID
10695137 - Publié(e) le:
11.12.2022 - Modifié(e) le:
20.02.2023