BIM-based integrated management workflow design for schedule and cost planning of building fabric maintenance
Auteur(s): |
Chao Chen
Llewellyn Tang |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Automation in Construction, novembre 2019, v. 107 |
Page(s): | 102944 |
DOI: | 10.1016/j.autcon.2019.102944 |
- Informations
sur cette fiche - Reference-ID
10375099 - Publié(e) le:
21.09.2019 - Modifié(e) le:
06.10.2019