BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 2. Development and site trials
Auteur(s): |
Zhenzhong Hu
Jianping Zhang |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Automation in Construction, mars 2011, n. 2, v. 20 |
Page(s): | 167-180 |
DOI: | 10.1016/j.autcon.2010.09.014 |
- Informations
sur cette fiche - Reference-ID
10188997 - Publié(e) le:
10.12.2018 - Modifié(e) le:
10.12.2018