A Bi-Objective Model for Scheduling Construction Projects Using Critical Chain Method and Interval-Valued Fuzzy Sets

Auteur(s):

ORCID

Médium: article de revue
Langue(s): anglais
Publié dans: Buildings, , n. 7, v. 12
Page(s): 904
DOI: 10.3390/buildings12070904
Abstrait:

Numerous constraints affect construction projects, and lack of management may lead to schedule deviation. In the execution phase of the project, due to the lack of timely access to the required resources and the existence of uncertainty, the project activities do not progress following the schedule, and as a result, schedule deviation occurs. The scheduling addresses resource constraints by the critical chain method and deals with delays in activities by placing buffers that have emerged as a method for scheduling construction projects. This paper presents a new bi-objective mathematical model which aims to reduce delay and increase quality, based on the critical chain method and resource constraint for scheduling construction projects. In the proposed model, the activities have been considered multi-mode ones. Moreover, this paper has assumed each activity to be executed in a normal or crashing way. Due to the uncertainty in real-world problems, the duration of the activity is expressed using triangular interval-valued fuzzy numbers. A new interval-valued fuzzy solution process is presented in this paper using a two-step approach. First, the equivalent crisp model is given; then in the second step, a goal programming approach is applied for transforming the bi-objective model into the single-objective one. Finally, the mathematical model is implemented on a case study adapted from the literature, and sensitivity analysis of the results is conducted.

Copyright: © 2022 by the authors; licensee MDPI, Basel, Switzerland.
License:

Cette oeuvre a été publiée sous la license Creative Commons Attribution 4.0 (CC-BY 4.0). Il est autorisé de partager et adapter l'oeuvre tant que l'auteur est crédité et la license est indiquée (avec le lien ci-dessus). Vous devez aussi indiquer si des changements on été fait vis-à-vis de l'original.

  • Informations
    sur cette fiche
  • Reference-ID
    10688656
  • Publié(e) le:
    13.08.2022
  • Modifié(e) le:
    10.11.2022
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine