Beijing Airport Terminal 3
Auteur(s): |
Martin Manning
H. Falter R. Henley P. Cross Y. Asaoka J. Kerry P. Dallard M. Kwok G. Ho R. Delaney |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Steel Construction, mars 2009, n. 1, v. 2 |
Page(s): | 1-8 |
DOI: | 10.1002/stco.200910001 |
Abstrait: |
Between October 2003 and July 2004, Arup, in a joint venture with the Dutch airport planners NACO and the architects Foster & Partners, designed the Terminal and Ground Transportation Centre needed for the 2008 Olympic games at Beijing Airport. Work commenced on site in March 2004 and ended almost four years later with the opening ceremony in February 2008. This was the team's third airport together, the forerunners being Stansted Airport, London, in the late 1980s and Chek Lap Kok Airport, Hong Kong, in the late 1990s. For each terminal the basic engineering diagram is similar. |
Mots-clé: |
aérogare conception sismique ossature tridimensionnelle
|
Disponible chez: | Voir chez l'éditeur |
Ouvrages et projets
- Informations
sur cette fiche - Reference-ID
10058258 - Publié(e) le:
15.11.2010 - Modifié(e) le:
13.08.2014