BDM–MDM integrated solution concept for scheduling information-driven projects
Auteur(s): |
J. Uma Maheswari
Purva Mujumdar S. P. Sreenivas Padala Abhishek Gwaskoti |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Engineering, Construction and Architectural Management, mai 2021, n. 2, v. 29 |
Page(s): | 1016-1037 |
DOI: | 10.1108/ecam-07-2020-0484 |
- Informations
sur cette fiche - Reference-ID
10608387 - Publié(e) le:
15.05.2021 - Modifié(e) le:
23.03.2022