0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Barriers for implementing solar energy initiatives in Nigeria: an empirical study

Auteur(s):
ORCID

ORCID
Médium: article de revue
Langue(s): anglais
Publié dans: Smart and Sustainable Built Environment, , n. 3, v. 11
Page(s): 647-660
DOI: 10.1108/sasbe-06-2020-0094
Abstrait:

Purpose

Despite the abundant renewable energy potential in the Nigeria, the power-sector stakeholder has not paid attention to the prospect of the natural resources that can be accrued when it is properly harnessed. Although a very negligible fraction of the population has invested in solar photovoltaics (PVs) for home solution, the initiative was only made public commercialised under the public-private partnership (PPP) and the objectives of the Power Sector Reform Act. 2005. It is, therefore, aimed to investigate the causes and insight of the barriers that are responsible for the slow implementation of the solar energy initiative in the Nigeria.

Design/methodology/approach

An empirical study was performed in the Nigeria. The study was conducted qualitatively, through semi-structured face-to-face interviews of 25 participants. The interviews were recorded, transcribed, interpreted, coded, categorised into themes and analysed by content analysis.

Findings

The study reveals technological, financial, political and social barriers have been the reason for slowing down solar energy development in Nigeria. While the technical barrier is a challenge to the solar energy implementation, socio-cultural issues have also been an obstacle to the implementation process. It is suggested that, the stakeholders of the initiative endeavour to proffer sustainable policies to enable public and private promoters to be able to generate and distribute electricity through solar PV and to complement the inadequate conventional electricity sources from the grids.

Originality/value

The paper provides a richer insight into the understanding and awareness of barriers for implementing solar energy strategies in Nigeria.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1108/sasbe-06-2020-0094.
  • Informations
    sur cette fiche
  • Reference-ID
    10779791
  • Publié(e) le:
    12.05.2024
  • Modifié(e) le:
    12.05.2024
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine