Automatic control of groundwater balance to combat dewatering during construction of a metro system
Auteur(s): |
Shui-Long Shen
Hai-Min Lyu Annan Zhou Lin-Hai Lu Gang Li Bing-Bing Hu |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Automation in Construction, mars 2021, v. 123 |
Page(s): | 103536 |
DOI: | 10.1016/j.autcon.2020.103536 |
- Informations
sur cette fiche - Reference-ID
10540624 - Publié(e) le:
03.01.2021 - Modifié(e) le:
19.02.2021