Automated generative design and prefabrication of precast buildings using integrated BIM and graph convolutional neural network
Auteur(s): |
Kexin Li
Vincent J. L. Gan Mingkai Li Maggie Y. Gao Robert L. K. Tiong Yaowen Yang |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Developments in the Built Environment, avril 2024, v. 18 |
Page(s): | 100418 |
DOI: | 10.1016/j.dibe.2024.100418 |
- Informations
sur cette fiche - Reference-ID
10775944 - Publié(e) le:
29.04.2024 - Modifié(e) le:
29.04.2024