Asset Management Perspective on the Duration of Public-Private Partnership Contracts: Cost-Control Trade-off?
Auteur(s): |
Marc van Buiten
Andreas Hartmann |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Construction Engineering and Management, mars 2015, n. 3, v. 141 |
Page(s): | 04014080 |
DOI: | 10.1061/(asce)co.1943-7862.0000937 |
- Informations
sur cette fiche - Reference-ID
10169987 - Publié(e) le:
11.12.2018 - Modifié(e) le:
11.12.2018