0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Application Time Management of Concrete Precast Wall Work on High-rise Campus Building

Auteur(s):
Médium: article de revue
Langue(s): anglais
Publié dans: IOP Conference Series: Earth and Environmental Science, , n. 1, v. 1169
Page(s): 012045
DOI: 10.1088/1755-1315/1169/1/012045
Abstrait:

In the implementation of building construction, especially in the context of functionality of campus buildings, punctuality is an important thing that must be strictly followed because it concerns the start of lecture schedules that cannot be delayed. Therefore, it is necessary to have precise time management of building construction during all the implementation. It’s cannot be separated in building construction between the innovation of work methods and improvisation of quality control which are two processes that need to be implementation in an effort to achieve efficiency and. One of the innovations in building construction, is installation of a concrete precast wall as a cover for the facade of the Binus campus building. Concrete precast wall is made of a good material, as an effort to reduce solar heat entering the room. Furthermore, all existing constraints must be mapped properly as support implementation concrete precast wall. One of antecedents of implementation concrete precast wall in building construction is time management of machine construction tools when use tower crane. Researcher knows the issues of building construction are limitations time using tower crane efficiently, working tools, weather conditions, time of material application, labelling system, quality control mechanism and installation system. In other side, those strengths, weaknesses, opportunities, threats, that can be used as an approach and analysis, start from resource mapping, work requirements, material quality control and coordination systems between sub-supporters. The success of this work depends on the application and coordination calculation time, inspection and quality procedure is main of a consistent methodology from manufacturing in the workshop to installation in the field. In addition, efficiency and effectiveness can provide good quality, saving time and costs.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1088/1755-1315/1169/1/012045.
  • Informations
    sur cette fiche
  • Reference-ID
    10780389
  • Publié(e) le:
    12.05.2024
  • Modifié(e) le:
    12.05.2024
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine