Applicability estimation for cable assembling method of shield tunnel using field test construction
Médium: | article de revue |
---|---|
Langue(s): | coréen |
Publié dans: | Journal of Korean Tunnelling and Underground Space Association (한국터널지하공간학회 논문집), 2015, n. 1, v. 17 |
Page(s): | 11 |
DOI: | 10.9711/ktaj.2015.17.1.011 |
- Informations
sur cette fiche - Reference-ID
10394627 - Publié(e) le:
04.01.2020 - Modifié(e) le:
04.01.2020