0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Anwendung einer geo-elektrischen Untersuchungsmethode für Mauerwerk im Rahmen eines Instandsetzungsvorhabens / Geo-Electrical Survey of Masonry for Restoration Projects

Auteur(s):

Médium: article de revue
Langue(s): anglais
Publié dans: Restoration of Buildings and Monuments, , n. 2, v. 6
Page(s): 151-172
DOI: 10.1515/rbm-2000-5462
Abstrait:

Geo-electrical relative difference mapping is presented as a non-destructive evaluation technique for ancient masonry. The method allows to visualise the internal structure and condition of the masonry. The decision on the necessity and on the type and degree of consolidation or strengthening of the masonry wall can be based on the information, obtained from the mapping. The paper deals with the arrangement of the original measurements to make them suitable for engineering evaluation. Firstly a numerical model is presented to filter out the influence of geometrical boundary conditions: they distort the measurements, but are of no interest for the evaluation. Secondly the maps are calibrated, to eliminate the influence of measuring configuration, and moisture content. The calibration methods are presented, and applied on the resistivity measurements, executed at the restoration project of the building "Duke's Mills" (13th Century) at Aarschot (B).

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1515/rbm-2000-5462.
  • Informations
    sur cette fiche
  • Reference-ID
    10532593
  • Publié(e) le:
    17.12.2020
  • Modifié(e) le:
    19.02.2021
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine