Analytical method for new tunnel crossing pile foundation of existing bridge: a case study
Auteur(s): |
Kuan-Jun Wang
(Senior Engineer, POWERCHINA Huadong Engineering Corporation Limited, Hangzhou, Zhejiang, PR China)
Guo-Yao Li (Postgraduate student, School of Mechanics and Civil Engineering, China University of Mining and Technology, Xuzhou, Jiangsu, PR China) Pin-Qiang Mo (Associate Professor, State Key Laboratory for GeoMechanics and Deep Underground Engineering, School of Mechanics and Civil Engineering, China University of Mining and Technology, Xuzhou, Jiangsu, PR China (corresponding author: )) Zhongqi Shi (Deputy Director, R & D Center, Shenzhen Urban Public Safety and Technology Institute, Shenzhen, Guangdong, PR China) Fu-Bin Chen (Deputy Director, Shenzhen Transportation Public Facilities Construction Center, Futian Transportation Hub, Shenzhen, Guangdong, PR China) Xin-sheng Yin (Associate Professor, Key Laboratory of Safe Construction and Intelligent Maintenance for Urban Shield Tunnels of Zhejiang Province, Hangzhou City University, Hangzhou, Zhejiang, PR China) |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, décembre 2023, n. 6, v. 176 |
Page(s): | 629-645 |
DOI: | 10.1680/jgeen.23.00060 |
- Informations
sur cette fiche - Reference-ID
10743188 - Publié(e) le:
28.10.2023 - Modifié(e) le:
14.01.2024