Analytical method for new tunnel crossing pile foundation of existing bridge: a case study
Auteur(s): |
Kuan-Jun Wang
(Senior Engineer, POWERCHINA Huadong Engineering Corporation Limited, Hangzhou, Zhejiang, PR China)
Guo-Yao Li (Postgraduate student, School of Mechanics and Civil Engineering, China University of Mining and Technology, Xuzhou, Jiangsu, PR China) Pin-Qiang Mo Zhongqi Shi (Deputy Director, R & D Center, Shenzhen Urban Public Safety and Technology Institute, Shenzhen, Guangdong, PR China) Fu-Bin Chen (Deputy Director, Shenzhen Transportation Public Facilities Construction Center, Futian Transportation Hub, Shenzhen, Guangdong, PR China) Xin-sheng Yin (Associate Professor, Key Laboratory of Safe Construction and Intelligent Maintenance for Urban Shield Tunnels of Zhejiang Province, Hangzhou City University, Hangzhou, Zhejiang, PR China) |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, décembre 2023, n. 6, v. 176 |
Page(s): | 629-645 |
DOI: | 10.1680/jgeen.23.00060 |
- Informations
sur cette fiche - Reference-ID
10743188 - Publié(e) le:
28.10.2023 - Modifié(e) le:
14.01.2024