地铁车站基坑“先浅后深”施工的影响分析 (Analysis of the Influence of the Excavation of the Working Shaft on Adjacent Structure by Shallow-First-and-Then-Deep Sequence)
Auteur(s): |
王成
|
---|---|
Médium: | article de revue |
Langue(s): | chinois |
Publié dans: | Hans Journal of Civil Engineering 的中文名称是土木工程, 2023, n. 2, v. 12 |
Page(s): | 92-99 |
DOI: | 10.12677/hjce.2023.122011 |
- Informations
sur cette fiche - Reference-ID
10713471 - Publié(e) le:
21.03.2023 - Modifié(e) le:
21.03.2023