0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Analysis of the dominant factors causing cost overrun in building construction projects

Auteur(s):

Médium: article de revue
Langue(s): anglais
Publié dans: IOP Conference Series: Earth and Environmental Science, , n. 1, v. 794
Page(s): 012008
DOI: 10.1088/1755-1315/794/1/012008
Abstrait:

In building construction projects there are 3 factors that are used to measure project performance, one of which is cost. Efforts that can be made to minimize the cost overrun are knowing the causative factors and knowing how to mitigate them. The purpose of this study is to identify the causative factors, determine the dominant factors causing cost overrun, and efforts to mitigate them. The methodology in this research is desk research or research that uses relevant secondary data analysis, such as previous research with similar problems. The results of this study were 65 causative factors divided into 10 groups. The dominant factor causing cost overruns includes material, implementation and employment relationships, project documents, and project finance groups, one of them is fluctuations in material prices. Mitigation efforts have been obtained for the dominant factor, namely quality control in the field must be good, selection of professional workforce, and building good relations between parties.

License:

Cette oeuvre a été publiée sous la license Creative Commons Attribution 3.0 (CC-BY 3.0). Il est autorisé de partager et adapter l'oeuvre tant que l'auteur est crédité et la license est indiquée.

  • Informations
    sur cette fiche
  • Reference-ID
    10781071
  • Publié(e) le:
    11.05.2024
  • Modifié(e) le:
    05.06.2024
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine