0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Auteur(s):


Médium: article de revue
Langue(s): anglais
Publié dans: Transportation Research Record: Journal of the Transportation Research Board, , n. 1, v. 1561
Page(s): 44-52
DOI: 10.1177/0361198196156100106
Abstrait:

Many facilities on the nation's bridge network are either in need of structural repair or are of inadequate design to service a modern fleet of vehicles in a safe and efficient manner. These needs have arisen at a time when available funding for bridge capital outlays is limited. To rectify this situation, ISTEA legislation of 1991 mandated the development of bridge management systems. A primary role of these systems is to provide a systematic analysis of optimal policies in the programming of bridge rehabilitation and replacement activities. A procedure that can be used to evaluate a set of possible optimal policies using output from the Indiana Bridge Management System is presented. The types of uses for a bridge management system are emphasized.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1177/0361198196156100106.
  • Informations
    sur cette fiche
  • Reference-ID
    10778618
  • Publié(e) le:
    12.05.2024
  • Modifié(e) le:
    12.05.2024
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine