0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Analysis of Longitudinal Force of Beam and Rail of Continuously Welded Rails (CWR) on Railway Bridge

Auteur(s):





Médium: article de revue
Langue(s): anglais
Publié dans: Journal of Physics: Conference Series, , n. 1, v. 2148
Page(s): 012065
DOI: 10.1088/1742-6596/2148/1/012065
Abstrait:

To study the longitudinal force of CWR on viaduct, a track-bridge-pier finite element model is established. Taking a multi-span simply supported beam with a maximum span of 32.7m of an elevated CWR as an example, the additional expansion and contraction forces, displacement between rail and beam and the force of pier are calculated, and whether the rail stress meets the requirements when setting constant resistance fasteners is checked. The results show that: (1) For the left and right lines, the maximum additional expansion forces of single strand rail are both 211.13kN, and the maximum relative displacements between beam and rail are both 6.572mm. (2) The maximum value of the additional expansion and contraction forces and the relative displacement between beam and rail of the same line occur at the same position. The left line is at ZFZ29 pier and the right line is at ZFS31 pier. (3) The maximum force of pier in this section is 500.80kN, and the pier numbers are ZFZ27 and ZFS29. (4) The rail stress is less than the allowable stress of 352MPa, and the rail strength meets the requirements.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1088/1742-6596/2148/1/012065.
  • Informations
    sur cette fiche
  • Reference-ID
    10670905
  • Publié(e) le:
    28.05.2022
  • Modifié(e) le:
    28.05.2022
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine