Analysis of factors influencing resource scheduling for emergency construction projects considering multiple spatial characteristics
Auteur(s): |
Jun long Peng
Xiao Liu |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Developments in the Built Environment, mars 2024, v. 17 |
Page(s): | 100329 |
DOI: | 10.1016/j.dibe.2024.100329 |
- Informations
sur cette fiche - Reference-ID
10761229 - Publié(e) le:
15.03.2024 - Modifié(e) le:
15.03.2024