Analysis of Control of Costs and Time with Earned Value Method on Road Maintenance Projects in Palmerah District, West Jakarta
Auteur(s): |
Sandy Radhitya Akbar
Asep Setiawan M. Rozahi Istambul Raden Herdian Bayu Ash Siddiq |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Civil Engineering and Architecture, mai 2019, v. 7 |
Page(s): | 27-34 |
DOI: | 10.13189/cea.2019.071305 |
Lieux géographiques
- Informations
sur cette fiche - Reference-ID
10611820 - Publié(e) le:
01.07.2021 - Modifié(e) le:
25.09.2023