Analysis and modeling of delays during construction handover stage for building projects: a case study of United Arab Emirates
Auteur(s): |
Fatma Hosny
Mohamed El-Damaty Bharadwaj R. K. Mantha Saleh Abu Dabous |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | International Journal of Building Pathology and Adaptation |
DOI: | 10.1108/ijbpa-05-2024-0096 |
- Informations
sur cette fiche - Reference-ID
10821446 - Publié(e) le:
12.03.2025 - Modifié(e) le:
12.03.2025