기초 및 바닥층 동시타설 공사의 개선방안 연구 (An Improvement of Concurrent Placement of Footing and Slab Concrete)
Auteur(s): |
Dong-Hoon Lee
Jae-Hwi Choi Jong-Il Kill Deok-Seok Seo Sun-Kuk Kim |
---|---|
Médium: | article de revue |
Langue(s): | coréen |
Publié dans: | Journal of the Korea Institute of Building Construction (한국건축시공학회지), décembre 2009, n. 6, v. 9 |
Page(s): | 121-129 |
DOI: | 10.5345/jkic.2009.9.6.121 |