0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Advanced Ground Freezing at the Hallandsås Project, Sweden

Auteur(s):

Médium: article de revue
Langue(s): anglais
Publié dans: Geomechanik und Tunnelbau, , n. 5, v. 1
Page(s): 512-517
DOI: 10.1002/geot.200800042
Abstrait:

An extensive fault zone within the Hallandsås Project Sweden, a railway tunnel project in southwest of Sweden, is subject of an advanced ground freezing operation in order to facilitate TBM excavation through this section. The rock mass within the fault zone consists of a completely decomposed gneiss and amphibolite in combination with 10 to 12 bar ground water pressure. Ground freezing was carried out in 16 horizontally drilled freeze holes with a length of 100 m. Within the 10.6 m diameter final tunnel section a small 5 m diameter pilot tunnel was excavated through the frozen area. The design and execution of the freezing and excavation operations have followed the observational method. This included prediction, monitoring and follow up of all parameters associated with design of frozen ground, such as strength and creep properties, as well as design aspects on the final segmental lining installed by the TBM. By thorough project management and active design it is possible to control the involved processes and achieve a transparent methodology in predicting and executing tunnelling using the freezing method.

Disponible chez: Voir chez l'éditeur

Ouvrages et projets

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1002/geot.200800042.
  • Informations
    sur cette fiche
  • Reference-ID
    10031983
  • Publié(e) le:
    20.01.2009
  • Modifié(e) le:
    15.08.2014
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine