0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Administration Impairments Resulting from Imbalanced Contract Conditions: Owner Payment Default

Auteur(s): ORCID (Professor of Construction Engineering and Management, Dept. of Civil and Environmental Engineering, Maroun Semaan Faculty of Engineering and Architecture, American Univ. of Beirut, P.O. Box 11-0236, Beirut 1107 2020, Lebanon (corresponding author))
(Formerly, Graduate Student, Engineering Management Program, Maroun Semaan Faculty of Engineering and Architecture, American Univ. of Beirut, Bechtel Engineering Bldg., Beirut 1107 2020, Lebanon.)
(Graduate Student, Engineering Management Program, Maroun Semaan Faculty of Engineering and Architecture, American Univ. of Beirut, Bechtel Engineering Bldg., Beirut 1107 2020, Lebanon.)
Médium: article de revue
Langue(s): anglais
Publié dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, , n. 4, v. 11
Page(s): 05019003
DOI: 10.1061/(asce)la.1943-4170.0000321
Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1061/(asce)la.1943-4170.0000321.
  • Informations
    sur cette fiche
  • Reference-ID
    10579943
  • Publié(e) le:
    08.03.2021
  • Modifié(e) le:
    08.03.2021
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine