Adaptability of BIM technology to mitigate the cost overruns in design and build projects
Auteur(s): |
K. L. Chamikara
B. A. K. S. Perera Dinithi Piyumra Raigama Acharige Biyanka Ekanayake |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Construction Innovation |
DOI: | 10.1108/ci-01-2024-0018 |
- Informations
sur cette fiche - Reference-ID
10795868 - Publié(e) le:
01.09.2024 - Modifié(e) le:
01.09.2024