건축턴키공사 초기 단계에서의 클레임 방지를 위한 클레임요인 분석 및 대응방안에 관한 연구 - 국내공사 사례중심으로 - (A Study of Analyzing Claim Factor and Making Strategies to Prevent Claim in Early Stage for Architectural Turn-key Project - Focusing on Domestic Project -)
Auteur(s): |
Jun-Seon Yoon
Byoung-Eok Yoo |
---|---|
Médium: | article de revue |
Langue(s): | coréen |
Publié dans: | Journal of the Korea Institute of Building Construction (한국건축시공학회지), mars 2006, n. 1, v. 6 |
Page(s): | 93-99 |
DOI: | 10.5345/jkic.2006.6.1.093 |
- Informations
sur cette fiche - Reference-ID
10762255 - Publié(e) le:
15.03.2024 - Modifié(e) le:
15.03.2024