A 5D simulation method on post-earthquake repair process of buildings based on BIM
Auteur(s): |
Xu Zhen
Zhang Furong Jin Wei Wu Yingying Qi Mingzhu Yang Yajun |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Earthquake Engineering and Engineering Vibration, juillet 2020, n. 3, v. 19 |
Page(s): | 541-560 |
DOI: | 10.1007/s11803-020-0579-5 |
- Informations
sur cette fiche - Reference-ID
10579142 - Publié(e) le:
04.03.2021 - Modifié(e) le:
04.03.2021