A 3D numerical model to determine suitable reinforcement strategies for passing TBM through a fault zone, a case study: Safaroud water transmission tunnel, Iran
Auteur(s): |
Mohammad Sina Abdollahi
Mehdi Najafi Alireza Yarahmadi Bafghi Mohammad Fatehi Marji |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Tunnelling and Underground Space Technology, juin 2019, v. 88 |
Page(s): | 186-199 |
DOI: | 10.1016/j.tust.2019.03.008 |
- Informations
sur cette fiche - Reference-ID
10310726 - Publié(e) le:
24.03.2019 - Modifié(e) le:
24.03.2019