A 2아치 터널 굴착 공법과의 비교를 통한 주방식 굴착 공법의 예비 경제성 검토 연구 (preliminary study on economical efficiency of a room-and-pillar excavation method in comparison with 2-arch tunnelling method)
Auteur(s): |
Chulho Lee
Soo-Ho Chang Sung-youll Ahn Hyu-Soung Shin |
---|---|
Médium: | article de revue |
Langue(s): | coréen |
Publié dans: | Journal of Korean Tunnelling and Underground Space Association (한국터널지하공간학회 논문집), 30 novembre 2013, n. 6, v. 15 |
Page(s): | 599-612 |
DOI: | 10.9711/ktaj.2013.15.6.599 |
- Informations
sur cette fiche - Reference-ID
10394870 - Publié(e) le:
26.11.2019 - Modifié(e) le:
26.11.2019