General Information
Name in local language: | Talbrücke Zedtlitzer Grund |
---|---|
Official designation: | BW 49 |
Beginning of works: | December 2009 |
Completion: | September 2011 |
Status: | in use |
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Box girder bridge |
Material: |
Steel-prestressed concrete composite bridge |
Construction method: |
Longitudinal launching |
Structure: |
Twin girder bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Borna, Leipzig (Kreis), Saxony, Germany |
---|---|
Carries: |
|
Part of: | |
Coordinates: | 51° 5' 48.83" N 12° 31' 33.19" E |
Technical Information
Dimensions
width | 29.5 m | |
total length | 315 m | |
span lengths | 45 m - 65 m - 65 m - 55 m - 45 m - 40 m | |
clearance | 4.585 m | |
number of spans | 6 | |
bridge surface | 8 292.5 m² | |
number of lanes | 2 x 2 | |
girders | width | 1.7 m |
height | 2.7 m | |
piers | width | 3.8 m |
height | 8 - 14.3 m | |
thickness | 3.6 m | |
superstructure | on-center distance between girders | 7.00 m |
Quantities
concrete volume | 7 240 m³ | |
prestressing steel | 140 t | |
reinforcing steel | 860 t | |
piers | structural steel | 320 t |
piles | total length of piles | 4 500 m |
superstructure | structural steel | 1 880 t |
shear studs | 60 t |
Materials
piers |
concrete-filled steel section
|
---|---|
deck slab |
prestressed concrete
|
abutments |
reinforced concrete
|
girders |
steel
(S 355)
|
Participants
Owner
Client
Design
Quality control
Contractor
Steel construction
Deep foundations
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20025265 - Published on:
16/11/2006 - Last updated on:
25/03/2018