0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Jembatan Tengku Fisabilillah; Jembatan Barelang; Jembatan I
Other name(s): Batam-Tonton Bridge; Barelang 1 Bridge; R. H. Fisabilillah Bridge
Beginning of works: 1995
Completion: 1997
Status: in use

Project Type

Location

Location: , ,
, ,
Part of:
Coordinates: 0° 58' 54.33" N    104° 2' 29.02" E
Show coordinates on a map

Technical Information

Dimensions

main span 350 m
length of side spans 146 m
total length 644 m
clearance 38 m
abutments number 2
deck deck width 21.5 m
number of longitudinal girders 2
pylons pylon height 199 m
number 2

Materials

cables steel
deck reinforced concrete
pylons reinforced concrete

Participants

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

More publications...
  • About this
    data sheet
  • Structure-ID
    20000633
  • Published on:
    10/03/2000
  • Last updated on:
    18/01/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine