General Information
Name in local language: | Segundo Puente sobre el Río Chama |
---|---|
Status: | under construction |
Project Type
Structure: |
Single-cell box girder bridge Haunched girder bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Prestressed concrete bridge |
Construction method: |
Balanced cantilever method |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
El Vigía, Merida, Venezuela |
---|---|
Location description: |
Crosses the Río Chama |
Coordinates: | 8° 38' 19.61" N 71° 38' 33.15" W |
Technical Information
Dimensions
total length | 528 m | |
span lengths | 88 m - 2 x 176 m - 88 m | |
number of spans | 4 | |
bridge surface | 6 758.4 m² | |
deck | ||
---|---|---|
width | 2 x 12.80 m | |
girder depth | 3.50 - 9.20 m | |
bottom flange | width | 7 m |
thickness of bottom flange | 0.22 - 1.30 m | |
webs | web thickness | 0.30 - 0.65 m |
Quantities
deck | ||
---|---|---|
concrete volume | 7 200 m³ | |
prestressing steel | 470 t | |
reinforcing steel | 1 200 t |
Materials
superstructure |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
Design
-
Diseño y Construcciones Integrados C.A.
- Luis B. Fargier-Gabaldon (designer)
- Jorge Kingland (designer)
Structural engineering
Co-contractor
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20078884 - Published on:
15/12/2019 - Last updated on:
15/12/2019