Beginning of works: 1994
Completion: 59 July 1995
Duration of works: 18 months
Status: in use

Project Type

Location

Location: , , , ,
Crosses:
  • Esla
Near: Ricobayo Dam (1935)
Coordinates: 41° 32' 6.82" N    5° 58' 42.65" W
Show coordinates on a map

Technical Information

Dimensions

total length 219 m
arch width 4.00 m
rise 24 m
span 164 m
thickness 1.70 - 2.123 m
deck span lengths 11.50 m - 14 x 14.00 m - 11.50 m
deck width 12.00 m
number of spans 16

Materials

piers steel
arch composite steel-reinforced concrete
deck slab prestressed concrete
girders steel
springings reinforced concrete
piers on arch steel

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20020988
  • Published on:
    28/04/2006
  • Last updated on:
    02/11/2018