0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1989
Completion: May 1991
Status: in use

Project Type

Location

Location: , ,
Address: LR-113
Replaces: Old Arenzana Bridge (1919)
Coordinates: 42° 22' 43.22" N    2° 44' 29.70" W
Show coordinates on a map

Technical Information

Dimensions

total length 80.60 m
span lengths 2 x 40 m
number of spans 2
bridge surface 902.72 m²
number of lanes 2
walkway width 2 x 1.00 m
superstructure deck depth 1.13 - 4.130 m
deck width 11.20 m

Cost

cost of construction Spanish peseta 76 610 785

Materials

superstructure composite steel-reinforced concrete
abutments reinforced concrete
pier reinforced concrete

Participants

Design
Contractor
Steel construction

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20076904
  • Published on:
    27/02/2019
  • Last updated on:
    27/02/2019
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine