0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2008
Completion: 11 September 2010
Status: in use

Project Type

Location

Location: , , ,
, , ,
Crosses:
  • Saone River
Replaces: Arciat Bridge
Coordinates: 46° 14' 30.86" N    4° 48' 33.97" E
Show coordinates on a map

Technical Information

Dimensions

total length 263 m

Materials

piers reinforced concrete
girder steel
deck slab reinforced concrete
abutments reinforced concrete

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20037929
  • Published on:
    26/06/2008
  • Last updated on:
    06/05/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine